What your coach hands you

Sample Team Readiness Report

Team Ridgeline / Team Readiness Report
Illustrative sample
Your coach's practicePrepared by your coach
Powered by CultureCamp
Team Readiness Report · Before the first session

Where we start: cutting decision time on architecture trade-offs from six weeks to two.

TeamRidgeline · Platform Eng + Product
Prepared forThe engineering lead
ResponsesLead + 8 of 8 team
Goal timeframe16 weeks
ReportTR-0412 · Readiness
01 · Confidence

How confident are we that we'll reach this goal?

Your confidence and the team's differ. A gap like this is common at the start of an engagement, and it shows where to begin.

You80%
Team average43%
Difference37 ptsSignificant gap

Shaded: the range of team answers, lowest to highest. Shown once five or more team members respond. Individual answers are never shown.

02 · What's in the way

Which challenge matters most?

You and your coach listed the challenges you see. Each team member chose the one most important to overcome. The team's top choice and yours differ.

  • No one is allowed to end a discussion.Team's top choice
    5 of 8
  • Engineering and Product define the problem differently.
    2 of 8
  • Too many people have to sign off on every trade-off.Your choice
    1 of 8
  • Trade-offs aren't written down, so they get reopened.
    0 of 8

Bars show team members' choices. Your choice is marked and not counted in the bars.

03 · Your coach's read

You and the team want the same thing. You'd get there differently.

What you share with the team

Everyone should be heard before a call is made. Seeking consensus is a core value for all nine of you, and 8 of 9 share Seeking input from others.

How you're different

The team decides together: it sits in Collaborate. You decide from expertise: you sit in Competence, the opposite corner.

Why this matters for the goal

You see the six weeks as a process problem: too many sign-offs. The team sees a permission problem: no one is allowed to end a discussion. Cutting sign-offs won't fix that. The first step is agreeing who can close which kinds of decisions.

A starting hypothesis to test together, not a verdict on anyone.

Collaborate 43% Command 13% Eng ↔ Product gap 0.62
One to watch · hasn't hit yet

Moving faster will feel like losing your voice. Seeking consensus and Seeking input from others are core values here, at 9-of-9 and 8-of-9 agreement, and so is Harmony. Name a decision owner without framing it and the team may read it as being cut out. Scoped to a class of decisions instead of a person, the same change lands differently.

Ridgeline's position, the lead's position, and what the goal requires Seven unlabelled individual positions cluster in the upper-left Collaborate quadrant. Two sit in the lower-right Competence quadrant; one of them, drawn as a square, is you, the engineering lead. The team centre sits in Collaborate, just above the horizontal midline. A marker for what the goal requires sits a short distance to its right at almost the same height, still inside the Collaborate quadrant. COLLABORATE COMMAND CULTIVATE COMPETENCE CERTAINTY POSSIBILITY RELATIONAL INDEPENDENT
● team centre  ■ you  ⊕ what this goal needs  · others never named
The gap to the goal is short and runs sideways. The team stays in its own quadrant; it just stops needing the whole group to close.
04 · How we'll measure progress

This is the starting point.

The team answers the same two questions again as the work goes on. Each report shows what moved.

  1. Week 1 · This reportTeam Readiness Report

    Decision time 6 weeks. Team confidence 43%.

  2. Every eight weeksTeam Progress Report

    A two-minute pulse and the same two questions.

  3. Week 16Team Results Report

    Before and after, against the goal.

Preview · Ridgeline's Team Results Report, week 16

The team still decides together. Now it decides faster.

Movement from the Team Readiness Report to the week-16 Team Results Report
What moved Week 1 Week 16 Note
Decision time on architecture trade-offs 6 weeks 3 weeks Target is 2
Team confidence in the goal 43% 64% Gap with the lead: 37 → 16 pts
"No one is allowed to end a discussion" as the top challenge 5 of 8 2 of 8 The team's top choice at kickoff
The lead and the team name the same top challenge No Yes  
How the team is wired Collaborate Collaborate Command share 13% → 16%

Partway there, on purpose. Real change is incremental. The team kept its instinct and added a way to close.

05 · Recommended moves

Three moves to start with

Each one is tied to the team's top challenge, and to a number your Team Progress Report will show.

  1. Agree who can close which decisions.

    List the kinds of architecture trade-off the team makes, and name who closes each one once everyone has been heard.

    Who
    You, with the team
    When
    Session 1
    How we'll know
    Fewer people name "no one is allowed to end a discussion" as the top challenge
  2. Run the next trade-off to a two-week deadline.

    Name the person who will close it before the discussion starts, and hold the date.

    Who
    The Engineering and Product leads
    When
    The next architecture review
    How we'll know
    Decision time on architecture trade-offs
  3. Keep every voice heard, not every voice deciding.

    Open a 48-hour input window on each trade-off. When it closes, the named person decides and says what they heard.

    Who
    You
    When
    From session 2
    How we'll know
    Team confidence in the goal

Illustrative sample using a composite team. Individual responses are never shown to managers or leadership. Team-level reporting begins at five responses — below that, results are shared openly with the team and the coach, and everyone is told before they answer.

Get your Team Culture Snapshot

A few details so your team is set up and ready when you arrive.

Let's talk.

Two ways to start — whichever suits you.